Post-flood subfloor reinstatement
Timber subfloor dry-out, contamination treatment and full rebuild after Brisbane River corridor inundation.
- LocationRocklea, Brisbane
- CategoryIICRC S500 Cat 3
From emergency flood responses to multi-month heritage restorations across Brisbane, Gold Coast and SEQ. Each entry documents the challenge, the scope and the outcome — we don't stage or retouch project photographs.
Timber subfloor dry-out, contamination treatment and full rebuild after Brisbane River corridor inundation.
Chloride-induced spalling broken out, reinforcement treated and reinstated to AS 3600 with anti-carbonation coating.
Lime-mortar repointing, fretwork repair to matched profiles and terracotta roof restoration under heritage approval.
Containment, HEPA-filtered negative pressure, strip-out and clearance testing after concealed roof leak.
Screw-pile underpinning and hardwood bearer replacement on a reactive-clay site, engineer-certified on completion.
Emergency make-safe, smoke and soot remediation, and full reinstatement coordinated end-to-end with the insurer.
Tell us about your building and we'll share relevant before-and-after references.
Start a conversationEach project begins with a documented assessment and ends with a completion report. The photography in our gallery is drawn from the same documentation that supports insurance claims, compliance certifications and client handover reports.
Contact us with your project type and location and we'll provide specific before-and-after references and, where clients have consented, contact referees.